Received the final number of additional thru hulls needed and placed that order today. Having them shipped out overnight so we can drop them off after work tomorrow. There are a total of 11 more that are needed. We are trying to get into the water by the end of the week. It’s a tight timeline but we are trying.
Engine is being installed in the next couple of days so we dropped off the Helm and steering wheel tonight so they can work on that once the engine is installed and give us another list of items needed to get it running.
We still need to have the compression post repaired so we can have the mast stepped. We aren’t sure that all of this will be done before Friday so we might have one more weekend on the hard for one final push to get anything else that we want done.
More updates to come – Hoping to splash midweek!!